Up to ₹1,08,000
Subsidy for a UP home
₹78,000 central under PM Surya Ghar plus ₹30,000 state top-up. Our in-house desk files it.
Waaree · TOPCon · Tubular 24 V · hybrid
5 nos Waaree 600–630 Wp TOPCon. Tubular battery bank (24 V, 150–200 Ah tubular). Single-kit and bulk rates are different.
Installation, civil work and net metering are part of the kit price. Only the subsidy release sits with the government portal.
Structure, cable, ACDB/DCDB, LA, earthing, accessories and civil work are the same for every brand at 3 kW. Only panels, inverter and battery change with the set you pick.
| Item — kya milta hai | Company | Watt / size | Quantity |
|---|---|---|---|
| This brand — panels, inverter, battery | |||
| TOPCon solar panels | Waaree | 600–630 Wp TOPCon | 5 nos |
| Hybrid inverter | UTL / Luminous / Microtek | 3 kW hybrid inverter, 24 V | 1 nos |
| Tubular battery bank | UTL | 24 V, 150–200 Ah tubular | 2 nos |
| Structure, civil work and accessories — same for this kW | |||
| Battery cable | RR / Havells | 16 sq mm | As per battery placement |
| DC solar cable (panel to inverter) | RR / Havells | 6 sq mm, UV resistant | 50 metres included in kit |
| AC cable (inverter to meter / DB) | RR / Havells | 6 sq mm | 35 metres included in kit |
| Earthing wire | RR / Havells | 4 sq mm | 50 metres included in kit |
| Rafter | GI structure | 21 feet, 4 mm | 3 nos |
| Purlin | GI structure | 21 feet, 3 mm | 3 nos |
| Base plate | GI structure | Structure base plate | 4–6 nos |
| DCDB box | Havells | 3 kW DCDB with SPD | 1 nos |
| ACDB box | Havells | 3 kW ACDB with MCB and SPD | 1 nos |
| Lightning arrestor (LA) | Standard LA | Roof-mounted lightning protection | 1 pc |
| Earthing rod | GI / chemical earthing | 1 metre rod | 3 pc |
| MC4 connectors | Compatible MC4 | Panel string connectors | 6 pairs |
| Spare parts and accessories | Kit pack | Clamps, nuts, conduits, glands, lugs and other kit hardware | 1 set |
| Civil work | Vira Solar | Structure foundation, grouting, earthing pits and inverter/battery platform | Included with this kit |
Up to ₹1,08,000
Subsidy for a UP home
₹78,000 central under PM Surya Ghar plus ₹30,000 state top-up. Our in-house desk files it.
In the price
Installation, civil work and net metering are part of the kit price. Only the subsidy release sits with the government portal. Installation is done by one of our 20+ in-house teams, and customer care after handover is ours too.
Finance
Up to 100% of the system can be financed. Government banks start around 5.5% a year and private banks and NBFCs around 7%.
Rates shown are the starting slabs published by the lenders and can change. Sanction, the rate you actually get, the funded share and the tenure are decided by the bank on your income and CIBIL, not by Vira Solar.
Quote
The table lists panels, inverter, RR/Havells DC/AC/earth wire with included metres, rafter, purlin, base plate, Havells ACDB and DCDB, LA, earthing rods, spare parts and civil work.
Yes. Panels, inverter and battery change by brand and set (TOPCon or bifacial; hybrid also tubular or lithium at 24 V or 48 V). Structure, cable, ACDB/DCDB, LA, earthing, accessories and civil work stay the same for this kW.
No. One kit is billed at the single-kit rate. Five or more kits are billed at the bulk rate, ₹5,000 less per kit.
A homeowner can buy one kit. A solar agency or any other buyer can order one kit or bulk. For a homeowner the price also covers installation, civil work and the net-metering process, and our in-house desk files the PM Surya Ghar and UPNEDA papers.
The metres shown are the standard kit pack. Extra DC, AC or earth cable is measured on site or from your layout and added to the quote.
Yes. Installation by one of our own teams, civil work and the net-metering process are inside the kit price for a homeowner. Only the subsidy release sits with the government portal. A UP home can claim up to ₹78,000 central and ₹30,000 state, so up to ₹1,08,000, subject to approval.
Yes. Government banks run rooftop solar loans from around 5.5% a year, private banks and NBFCs from around 7%, and up to 100% of the system can be funded. We help with the file, but sanction, the rate and the tenure are decided by the bank.